Bathroom We were invited to tender for a number and
variety of jobs by this client. In all the works including 2
bathrooms, new central heating boiler, new uPVC window including
creating the opening and re-plastering around half of the house.
Having completed the upstairs bathroom (see
here for more information)
this particular piece of work was to update the downstairs bathroom.
The client wanted to increase the size of the bathroom to allow
for a slightly improved layout and given the other works we carried
out to replace the central heating boiler, the removal of the
cylinder cupboard made this possible.
Again a nice choice in suite and plain yet elegant tiles have
really made this room feel luxurious.
AWI helped design & specify, supplied & installed this bathroom.
From start to finish the job included:
- Removal of the existing suite, wall & floor
covering
- Installation of new Worcester Bosch Hi-flow gas fired combination boiler
and removal of hot water cylinder
- Demolition of the airing cupboard
- Ceiling dropped and insulated
- Ceiling skimmed and painted with 3 coats
kitchen/bathroom paint
- Walls fully tiled including an inset mirror
- Floor fully tiled
- Installation of the new bathroom suite including
thermostatic mixer shower, towel rail, wall hung basin and bath
|