| Ascot Way 2, Accrington
Following recommendation from a previous customer (see
here for more information) we were asked
to supply a design for this bathroom. Although this room
contained a delightful banana suite (Sunshine Yellow I think someone
once named it!) we suggested altering
the layout
We moved the WC, basin and bath around to allow us to
install a shower screen above the bath - something which was impossible due to the
fall of the stairs encroaching on this downstairs bathroom.
We suggested a showering bath with new high power electric shower
and vanity units to provide much needed storage. We also
squared off the ceiling line where the stairs fell to tidy things up
a little and allow us to install cladding and spotlights.
Once again, a completely different room - our customer is very
pleased with the result and allowed us to continue with the
cloakroom renovation!
AWI designed, specified, supplied and installed this bathroom.
From start to finish the job included:
- Removal of the existing suite, wall & floor
covering
- Squaring off the ceiling including framing and
boarding
- Installation of PVC ceiling cladding
- Installation of 4 * IPX4 SELV chrome
down-lighters and an extractor fan
- Re-wiring including installation of an RCD
protected consumer unit and new supplies for the electric shower
(Mira Sport Max 10.8Kw) and under-tile heating
- Re-plumbing including moving the WC, basin and
bath around to their new locations
- Walls fully tiled (ceramic tiles)
- Floor fully tiled (granite like hi-tec composite
tiles) including installation of Warmup under-tile heating system
- Installation of the new bathroom suite including
p-bath showering bath, screen, panel, vanity units as per the
pictures including semi-recessed basin and concealed cistern WC, towel radiator and
accessories
|