| Baycliffe Cloakroom WC, Lymm
Following renovating the main bathroom we were asked to bring the
cloakroom up-to date also.
AWI designed, specified, supplied and installed this bathroom.
From start to finish the job included:
- Removal of the existing suite, wall & floor
covering
- Skimming of the ceiling and walls which would not
be tiled
- Making good of the walls in preparation for
tiling
- Installation of 2 * spotlights and a 5" fan
- Re-plumbing as required to support the new layout
including re-locating the stop-cock and water meter into the
adjoining garage
- Walls partly tiled (ceramic tiles)
- Floor fully tiled (porcelain tiles)
- Installation of the new bathroom suite including
vanity units as pictured, wall hung basin, WC, towel radiator and
accessories
|