| Harrogate Crescent, Burnley - Main
Bathroom
Truly frightening - our client moved into this house a number of
years ago and was left the legacy of a badly bodged bathroom.
Wooden panelling on the walls within the shower were probably the
worst thing ever, soaked and "living" so to speak.
There were no layout changes just a new suite, heated programmable
towel rail instead of the storage heater and the room fully tiled.
We and our client are really pleased with the room which I think
you will agree is a major and stunning transformation.
AWI designed, specified, supplied & installed this bathroom.
From start to finish the job included:
- Removal of the existing suite, wall & floor
covering
- Ceiling clad with white gloss uPVC ceiling
cladding
- Installation of 4 * IPX4 SELV down-lighters & extractor fan on separate switch
- Re-wiring to provide RCD protected programmable
electrically heated towel rail
- Walls fully tiled (ceramic tiles)
- Floor fully tiled (porcelain tiles)
- Installation of the new bathroom suite including
Trojancast re-inforced acrylic bath with Manhattan M3 swiftseal
shower screen above, electric shower, WC,
basin and towel rail
|