| Kay Street, Clitheroe - Main
Bathroom When we first met our customer (and bathroom)
we were warned that the bathroom had some interesting features.
Nothing could have prepared us for a claret coloured suite with hand
crafted timber firmly attached to everything in sight.
The many features included a great shower - hand made of course,
with dual showering - you could get wet in the shower cubicle and
also in the kitchen below - saves a lot of time in the mornings.
Needless to say, they had not got much use from their inherited
shower.
We were asked to remove (destroy might have been closer to the
truth), brighten, skim the walls with tiling in the right places and
add a new suite including shower, bath, vanity unit and WC.
Our customer will be having a soft floor covering fitted after
which we will return to fit skirting boards within the room.
Bathroom, customer and us - all delighted.
AWI designed, specified, supplied & installed this bathroom.
From start to finish the job included:
- Removal of the existing suite, wall and floor
covering
- Re-wiring to add a new shower
circuit to cope with the high power 9.8Kw shower
- Preparation of the walls including re-dry-lining
- Skimming of the walls ready for painting (to be
done by the customer)
- Re-hanging of the door on the opposite side
- Re-plumbing as required to support the new layout
- Installation of PVC ceiling
cladding
- Installation of a 6 * IPx4 mains voltage halogen
down-lighters
- Walls partly tiled within the shower, around the
bath and basin (ceramic tiles)
- Installation of the new bathroom suite including
large 1800 * 800mm bath, huge 1200 * 900mm Merlyn Series 5 offset
quadrant enclosure, Mira Sport 9.8Kw electric shower,
vanity unit with moulded sink top and lit mirror unit above, WC, towel rail and
accessories
|