| Mearley Syke, Clitheroe - Main
Bathroom We were invited to provide a design and
renovate this bathroom (look out in future for the en-suite which is
in the process of being renovated now following successful
completion of this room).
Our customer provided us with a brief to retain the vanity units
and to fully tile with the introduction of a power shower above the
bath. On this basis we specified an upgrade of the cold water
store in the loft space, introduction of a high pressure pump and
installation of a shower bath with double screens to create a shower
enclosure within the bath - which would of course contain the
additional spray common with power showers.
A new set of taps on the basin to match the bath taps and new WC
cistern completed the transformation leaving a luxurious feeling
room, which should not date in appearance any time soon.
AWI designed, specified, supplied and installed this bathroom.
From start to finish the job included:
- Additional framing in the loft space to extend
the tank stand to support the additional 50 gallon cold water store
- Installation of a Salamander 3.3bar pump in the
loft space including additional wiring and plumbing - the pump was
soundproofed using acoustic deadening installation to ensure quiet
operation - this pump feeds the bath and shower in the main bathroom
and shower only in the en-suite
- Removal of the existing suite, wall & floor
coverings
- Re-plumbing as required to support the new layout
including addition of a shower
- Installation of PVC ceiling cladding
- Installation of 4 * 35w SELV halogen spot lights
- Installation of chrome effect inline extractor
fan ducted outside
- Walls fully tiled (ceramic tiles)
- Floor fully tiled (porcelain tiles)
- Installation of the new bathroom suite including
replacement basin taps and waste, new concealed WC cistern,
re-installation of the WC pan, P shaped shower bath with
double screens, thermostatic mixer shower, shower tower which
includes deluge head and moveable riser rail, towel radiator and
accessories
|