| Pinewood Drive, Accrington - Main
Bathroom Having been recommended by friends this
customer approached us to renovate their main bathroom.
They wanted a shower enclosure with a decent shower and some
storage to keep their belongings in.
We suggested a large (90cm) shower enclosure complete with pumped
thermostatic shower and Utopia vanity units complete with
semi-recessed basin and concealed cistern WC.
While removing the existing suite, we found that the previous
fitter had cut through 3 joists, removing approximately 45% material
from each making them incredibly dangerous (the maximum permissable
notch is 12.5% and that is subject to other conditions). So
whilst on-site we re-enforced the joists by laminating them with new
joists which were bolted and glued into place.
AWI designed, specified, supplied & installed this bathroom.
From start to finish the job included:
- Removal of the existing suite, wall & floor
covering
- Cladding of the ceiling with PVC ceiling cladding
- Installation of 4 spotlights and separately
switched extractor fan
- Plaster-boarding of the walls in readiness for
tiling
- Installation of new shower pump in airing
cupboard including additional pipework and wiring
- Installation of vanity units as depicted
- Installation of electric shaver point mounted
inside one of the vanity unit cupboards and lit
mirror
- Walls fully tiled (ceramic tiles)
- Floor fully tiled (porcelain tiles)
- Installation of the new bathroom suite including
shower, WC, basin and towel rail
|