Home ] About Us ] Contact Us ] Site Map ]

Bathroom Installations
Kitchen Installations
Wall & Floor Tiling
General Plumbing Services
General Electrical Services
Plastering Services
Customer Testimonials
Useful Links

Anderson Road Upstairs
Anderson Road Downstairs
Fog Lane
Preston Old Road
Fountains Way
School House Fold
Cedar Avenue
Downham Avenue
Venice Court
Southwood Drive 2
Runshaw House
Harrogate Crescent
Castle Clough
Cartmel Drive
Acorn Avenue
Aviemore Close Main Bathroom
Blackburn Road
Nutter Road 2
Entwistle Road
Grange Road
Minehead Avenue
Ennerdale Close
Scott Street
Waltham Close
Victoria Buildings
Burnley Road
Pinewood Drive
Quebec Road
Daintiths Barn
Elmfield Street
Printers Fold Ensuite Bathroom
Printers Fold Main Bathroom
Longsight Road
England Avenue
Ashworth Terrace
Ascot Way 3 - Main Bathroom
Ascot Way 3 - Cloakroom WC
Rushmere
Aviemore Close Master Ensuite

Quebec Road
Quebec Road, Blackburn - Main Bathroom

Having already worked for the son of this customer (see here for more information) we were more than happy to take on this renovation project.

We apologise for the lack of before pictures but hopefully the description helps understand the changes implemented to produce this bathroom.

In the old room, the bath ran along under the window with the taps/shower where the new basin is;  The WC was in the same location and the basin was on the window wall at the bottom end of the bath.  The airing cupboard extended approximately 30cm/12" further into the room than it does now and was reduced to open up the space whilst still leaving a spacious airing cupboard (which was huge before).

The room wasn't very giving in it's ability to allow us to install a shower enclosure.  No wall except where the WC was had enough free space to accommodate the side tiled walls of the shower and if we put it where the WC was, there would be too little space to allow the WC to be used comfortably.

The solution (whilst un-usual) was to frame across the front of the window to the bare minimum required to accommodate the shower enclosure.  This framing was done in such a way that the window is still accessible and as a solution doesn't look odd in the room.

We clad the ceiling, added spotlights and an extractor fan and the remainder of the room was fully tiled with one or two luxuries including an extravagant cabinet and under-tile heating.

AWI designed, helped specify, supplied & installed this bathroom.

From start to finish the job included:

  • Removal of the existing suite, wall & floor covering
  • Reduction of the airing cupboard including re-framing and trimming/re-hanging of the door
  • Framing across the front of the window reveal to receive the shower enclosure
  • Re-hanging of the main door, opening on the opposite side including replacement of the door with a new one
  • Walls made good in readiness for tiling
  • Ceiling clad with 4 spotlights and extractor fan installed
  • Installation of vanity units as depicted
  • Installation of electric point to provide for the mirrored cabinet; Addition of new circuit to allow installation of Mira Sport Max shower; Addition of new circuit to allow for under-tile heating and other bathroom circuits
  • Walls fully tiled (ceramic tiles)
  • Floor fully tiled (porcelain tiles)
  • Installation of the new bathroom suite including shower, WC, basin and chrome towel rail


Home ] About Us ] Contact Us ] Site Map ]
 

  Site News
   

 

AWI Contracting Limited
Registered in England and Wales

Registration number:

 06750561

Registered Office:

4 Seathwaite Way
Accrington
BB5 6RB

Tel 01254 230002

Mobile 07838 250942

Fax 07005 806326

 

 

The Northwest's Premier Bathroom Installation Specialists - Why not call us now on 01254 230002 to arrange a free quotation.