| Reservoir Street, Darwen - Main
Bathroom Following a lengthy loft conversion, the main
bathroom finally had it's turn. Our customer did much of the
work themselves in shaping this room, originally it was very small
with a little more taken away to accommodate the stairs to the loft
conversion (you can see the slope above the WC) - our customer
extended the room, taking approx 1ft/30cm from the adjacent bedroom.
They also had the ceiling skimmed, installed the fan and lights.
AWI installed this bathroom.
From start to finish the job included:
- Removal of the existing suite
- Preparation of the walls including re-dry-lining/re-plastering
as required
- Re-plumbing as required to support the new layout
- Installation of the vanity units as depicted
- Walls fully tiled (ceramic tiles)
- Floor fully tiled (porcelain tiles) including the
installation of Warmup electric under-floor heating
- Installation of the new bathroom suite including
shower bath, shower screen, Hans Grohe iBox shower suite and bath
filler combination, semi-recessed basin in the vanity units,
concealed cistern WC, heated towel rail,
and
accessories
|